Circular No.: 152/08/2021-GST
Date of Circular: 17th June 2021
Relevant Sections and Rules:
- CGST Act, 2017:
- Section 2(119): Definition of “works contract”
- Section 168(1): Power to issue instructions
- CGST Rate Notification:
- Notification No. 11/2017 – Central Tax (Rate) dated 28.06.2017
- Entry 3(vi): 12% GST for construction services to Government Entities
- Entry 3(xii): 18% GST for composite supply of works contract not covered elsewhere
- Notification No. 11/2017 – Central Tax (Rate) dated 28.06.2017
Summary of Clarification Provided:
- Concessional Rate of 12% Not Applicable to Ropeway Construction for Government Entities:
The circular addresses whether construction of a ropeway on a turnkey basis provided to a Government Entity qualifies for the concessional GST rate of 12% under Entry 3(vi) of Notification No. 11/2017-CTR.
It clarifies that Entry 3(vi) applies only to civil structures meant predominantly for non-commercial use, and that too only for:
- Central Government,
- State Government,
- Union Territory,
- Local Authority, or
- Governmental Authority / Government Entity.
However, the exemption from the meaning of “business” does not apply to Governmental Authorities or Government Entities, and hence, commercial nature of the structure must be examined.
- Ropeway Construction for Tourism is Commercial – Not Covered Under Entry 3(vi):
Construction of a ropeway for tourism purposes is considered commercial/business in nature.
Even if executed for a Government Entity, it does not qualify as “meant predominantly for non-commercial use” and thus does not attract 12% GST under Entry 3(vi). - Classification and Applicable GST Rate – 18% Under Entry 3(xii):
Such construction work (e.g., ropeways) does not fall under:
- Entry 3(iv): road, bridge, terminal
- Entry 3(v): railways
Thus, it falls under the residuary entry 3(xii) of Notification No. 11/2017-CTR and is taxable at 18% GST.
Source: Circular No.: 152/08/2021-GST